Which NYC rules apply to my building?
Answer a few questions. The checklist updates as you go, with plain explanations, due windows and links to the official agency pages. Leave anything you are unsure about as “Not sure”.
This is general guidance from our requirements catalog, not a legal determination. Confirm with the agency.
May apply, we need more facts (41)
Annual notices (4)
Annual lead-paint notices · Housing Preservation and Development (HPD)Window January 1 to 16, 2027
3+ units, built before 1960; known lead in 1960–1978 housing needs agency review
Deliver official paper notices January 1–16, collect responses and follow up; retain turnover work.
Official agency pageExemptions vary; confirm with the agency.
Window guards and air-conditioner safety · Housing Preservation and Development (HPD) / Health Department (DOHMH)Window January 1 to 16, 2027
3+ units; guards apply where a child 10 or younger lives or a tenant requests them
Deliver annual notice; inspect guards and window AC installation. Confirm current installation rules.
HPD’s combined notice guidance uses January 1 to 16; DOHMH’s window-guard page says January 1 to 15. Confirm the applicable agency instructions and deliver early.
Official agency pageExemptions vary; confirm with the agency.
Steam-radiator safetyLocal Law 151 · Housing Preservation and Development (HPD)Window January 1 to 16, 2027
3+ residential units with steam heat
Annual paper notice begins in 2027; track inspection and repair records using existing radiator workflow.
Official agency pageExemptions vary; confirm with the agency.
Stove knob covers: annual offer and requested installation · Housing Preservation and Development (HPD)Due January 16, 2027
Gas stoves in multiple dwellings; confirm current request conditions
Offer covers or integrated-locking knobs annually. Make compatible devices available within 30 days of a written request; record request, provision and installation separately. Keep records five years; document incompatibility or replacement-limit exceptions.
Official agency page
Inspections and filings (15)
Indoor allergensLocal Law 55 · Housing Preservation and Development (HPD)Ongoing or building-specific date
3+ residential units
Inspect annually and on reported hazards; preserve existing LL55 inspections, lease notices and turnover records.
HPD requires annual inspections and responses to reported hazards, but does not give one citywide inspection date.
Official agency pageExemptions vary; confirm with the agency.
Gas line inspectionLocal Law 152 · Buildings Department (DOB)Ongoing or building-specific date
All buildings except Group R-3; buildings without gas still require the applicable certification
Use DOB community-district schedule; record licensed master plumber, inspection, certification filing and correction dates.
Official agency pageAnnual parapet observation · Buildings Department (DOB)Due December 31, 2026
Street / sidewalk-facing parapet, except detached 1–2 family homes
Keep observation report. If unsafe, immediately call 311 and email parapets@buildings.nyc.gov, install protection, and correct within 90 days. Habiready does not notify DOB.
Official agency pageExemptions vary; confirm with the agency.
Drinking water tank inspection and test · Health Department (DOHMH)Due December 31, 2026
Roof or pressurized drinking water tank
Inspect and test January 1–December 31; inspector submits by January 15 next year. Post results-access sign.
Official agency pageBackflow prevention device test · Environmental Protection Department (DEP)Ongoing or building-specific date
Backflow prevention device present
Annual certified tester report signed by a licensed master plumber and submitted to DEP; initial report within 30 days of installation.
Test every 12 months; use your DEP notification and previous test date. Initial testing is due within 30 days of installation.
Official agency pageExemptions vary; confirm with the agency.
Cooling tower registration and certification · Health Department (DOHMH)Due November 1, 2027
Cooling tower present
Register and certify yearly by November 1 through the city portal; keep maintenance records.
Official agency pageEnergy benchmarking and emissions reportsLocal Law 84 / Local Law 97 · Buildings Department (DOB)Due May 1, 2027
Confirmed on the applicable covered buildings list; LL84 and LL97 scopes differ
Track submission confirmations only. Confirm LL97 reporting path, June 30 grace and current-year extensions with DOB; no calculations or utility integration.
LL84 is due May 1 annually. The LL97 grace window shown is verified for 2026 only; confirm future-year extensions with DOB.
Official agency pageExemptions vary; confirm with the agency.
Facade inspection · FISPLocal Law 11 · Buildings Department (DOB)Window February 21, 2025 to February 21, 2027
Buildings taller than six stories
Confirm building sub-cycle and current filing window with DOB; store report, QEWI and filing status.
Cycle 10 has building-specific subcycles based on the last digit of the block number. Confirm your subcycle with DOB.
Official agency pageExemptions vary; confirm with the agency.
Annual boiler inspection · Buildings Department (DOB)Due December 31, 2026
Boiler present; DOB exemptions and inspection type require review
Complete applicable inspection and keep report, inspector and filing confirmation. Confirm report filing window.
Official agency pageExemptions vary; confirm with the agency.
Elevator Category 1 test · Buildings Department (DOB)Due December 31, 2026
Elevator present
Keep annual test report, inspector and filing confirmation; review corrections.
Official agency pageElevator Category 5 test · Buildings Department (DOB)Ongoing or building-specific date
Elevator subject to Category 5 test; confirm device type
CAT5 is due within five years from the month of the previous test or new elevator Certificate of Compliance. File within 21 days of the test. Confirm the device-specific date with DOB.
The five-year cycle depends on the month of the last CAT5 test or new-device Certificate of Compliance. File within 21 days of testing; confirm the device-specific deadline.
Official agency pageExemptions vary; confirm with the agency.
HPD property registration and information sign · Housing Preservation and Development (HPD)Window May 21, 2027 to September 1, 2027
3+ units, or 1–2 family where the owner does not live
Registration period May 21–September 1. Renew by September 1. Store registration number, filing date and proof; post building information sign.
Official agency pageDHCR annual apartment registration · NYS DHCRWindow April 1, 2027 to July 31, 2027
Rent-stabilized apartments; rent-control rules need separate confirmation
Register stabilized units April 1–July 31 and give tenants copies; initial registration within 90 days of becoming stabilized.
Official agency pageAnnual bedbug filing and tenant report · Housing Preservation and Development (HPD)Window December 1 to 31, 2026
Multiple dwelling with 3+ units
File during December; keep receipt and evidence of tenant distribution or posting; DBB-N at lease and renewal.
Official agency pageApartment XRF lead testingLocal Law 31 · Housing Preservation and Development (HPD)Ongoing or building-specific date
Pre-1960 housing; known lead in 1960–1978 housing needs review
The LL31 baseline XRF testing deadline was August 9, 2025. Record per-apartment status, testing date, EPA-certified inspector and report; confirm exemptions and earlier child-related triggers. Keep records ten years; testing does not replace annual notices or turnover work.
The baseline August 9, 2025 deadline has passed. Child move-in and agency orders can set earlier or building-specific testing deadlines; confirm with HPD.
Official agency pageExemptions vary; confirm with the agency.
Equipment (3)
Natural gas alarmsLocal Law 157 / Local Law 102 · Buildings Department (DOB)Due January 1, 2027
Gas appliances in apartments; confirm occupancy exemptions with DOB
Install code-compliant natural gas alarms in every applicable apartment by January 1, 2027. Record model, installation and replacement dates.
Official agency pageExemptions vary; confirm with the agency.
Smoke and carbon monoxide detectors · Housing Preservation and Development (HPD) / NYSOngoing or building-specific date
Residential apartments
Record installation and expiration for each detector; remind 60 days before replacement.
Official agency pageExemptions vary; confirm with the agency.
HPD-required heat sensorsLocal Law 18 · Housing Preservation and Development (HPD)Ongoing or building-specific date
HPD has notified the owner
Record HPD notice and deadline, installation and access records.
Only HPD-selected buildings: use the owner notice for installation timing. Monthly heat-season records are required; HPD recommends the 15th for the prior month, not a universal installation deadline.
Official agency pageExemptions vary; confirm with the agency.
Leases and disclosures (13)
Federal lead disclosure and EPA pamphlet · EPA / HUDOngoing or building-specific date
Housing built before 1978; federal exemptions require review
Provide required disclosures and EPA Protect Your Family pamphlet before signing; retain signed disclosure.
Official agency pageWindow guard lease notice · Housing Preservation and Development (HPD) / Health Department (DOHMH)Ongoing or building-specific date
3+ units
Track required lease notice and proof provided.
Official agency pageExemptions vary; confirm with the agency.
Indoor allergen hazard lease noticeLocal Law 55 · Housing Preservation and Development (HPD)Ongoing or building-specific date
3+ units
Provide indoor allergen notice and pamphlet and keep proof.
Official agency pageExemptions vary; confirm with the agency.
Bedbug history disclosure · DBB-N · NYS DHCROngoing or building-specific date
New lease and renewal; confirm required form version
Give official DBB-N and preserve delivery proof.
Official agency pageExemptions vary; confirm with the agency.
Sprinkler disclosure · RPL 231-a · NYSOngoing or building-specific date
Residential leases whether or not sprinklers exist
Record disclosure of system existence and required inspection details; no clause drafting.
Official agency pageFlood history and risk disclosure · RPL 231-b · NYSOngoing or building-specific date
Residential leases; effective June 21, 2023
Use official disclosure/source; record flood history and risk disclosure was provided.
Official agency pageGood Cause Eviction coverage notice · NYS DHCROngoing or building-specific date
Notice states whether covered and why; exemptions are not automatically inferred
Track official coverage/exemption notice in leases, renewals, 14-day demands and court filings; current rules require review.
Official agency pageExemptions vary; confirm with the agency.
At-least-5% rent increase / non-renewal advance notice · NYSOngoing or building-specific date
Rent increase of at least 5% or non-renewal; tenure and lease length set notice period
Record tenancy and lease duration; 30, 60 or 90 days advance notice according to NYS rules.
Official agency pageRent stabilization lease rider · NYS DHCROngoing or building-specific date
Stabilized apartments; confirm individual apartment status
Provide applicable DHCR rider and retain proof.
Official agency pageExemptions vary; confirm with the agency.
Smoking policy disclosure · Health Department (DOHMH)Ongoing or building-specific date
3+ units
Give written policy; keep copy and proof.
Official agency pageExemptions vary; confirm with the agency.
FARE Act listing fees and signed itemized disclosure · DCWPOngoing or building-specific date
Rental listings and leases; effective June 11, 2025
Landlord-hired broker cannot charge tenant. Disclose all listing fees and provide signed itemized fee disclosure before signing, copy to tenant; retain three years.
Official agency pageExemptions vary; confirm with the agency.
Fair Chance Housing notice and conditional offer · CCHROngoing or building-specific date
Criminal check used; owner-occupied two-family exemption requires confirmation
Give CCHR notice and conditional offer before check. Only permitted convictions may be reviewed; confirm 5-year felony / 3-year misdemeanor release/sentencing rules. Do not upload criminal records.
Official agency pageExemptions vary; confirm with the agency.
Application fee and security deposit limits · NYS Attorney GeneralOngoing or building-specific date
Residential rentals; statutory exceptions require review
Application credit/background check fee at most $20 (or actual cost if lower); security deposit at most one month rent. Keep itemized receipts; no payment collection here.
Official agency pageExemptions vary; confirm with the agency.
Building operations (6)
Heat season and year-round hot water · Housing Preservation and Development (HPD)Due May 31, 2027
Residential buildings
Heat season runs October 1 through May 31. Day (6 AM–10 PM): if it is below 55°F outside, indoor temperature must be at least 68°F. Night (10 PM–6 AM): indoor temperature must be at least 62°F, whatever the outside temperature. Hot water at a constant minimum of 120°F, all year. Keep temperature logs and repair records.
Official agency pageWritten smoking policyLocal Law 147 · Health Department (DOHMH)Ongoing or building-specific date
3+ residential units
Adopt written policy, give current and future tenants a copy and notify changes. Use city sample; Habiready does not draft legal terms.
Official agency pageExemptions vary; confirm with the agency.
Fire safety notices, guide and self-closing doors · Fire Department (FDNY)Ongoing or building-specific date
Multiple dwellings; review building occupancy and FDNY distribution rules
Track FDNY emergency guide/building information distribution (generally at least every three years and for new residents/updates), separate annual bulletin, permanent posted notices and functioning self-closing apartment doors. Confirm current distribution cycle before setting dates.
FDNY publishes a current annual bulletin and guide distribution rules, but this source does not establish a single citywide distribution date. Maintain self-closing doors all year.
Official agency pageExemptions vary; confirm with the agency.
Planned service interruption notices · Housing Preservation and Development (HPD)Ongoing or building-specific date
Planned heat, hot water, water, gas or electricity interruption
For planned service interruptions expected to last at least two hours, post English and Spanish notices at least 24 hours in advance; keep posted until restoration. For emergency or shorter work, post as soon as possible after work begins.
Official agency pageTrash and recycling containerization · Sanitation Department (DSNY)Ongoing or building-specific date
1–9 units require lidded bins; 10+ district rollout requires review
1–9 units: official NYC Bins required since June 1, 2026. For 10+ units, confirm borough/community-district Empire Bin rollout, 10–30 vs 31+ options and fees with DSNY. Outside rollout areas, bins after 6pm or bags after 8pm, by midnight; confirm building collection schedule.
Official agency pageExemptions vary; confirm with the agency.
Lead-safe renovation certified contractors · EPAOngoing or building-specific date
Paint-disturbing work in pre-1978 housing
Use certified firms and lead-safe practices; preserve work records.
Official agency pageExemptions vary; confirm with the agency.
City terms, explained
Track everything automatically
Habiready keeps each building’s deadlines, city records and proof in one place. 7-day free trial; card required.
Habiready organizes records and alerts; it does not file with agencies, send notices for owners or guarantee compliance.